TA3D: Timing-Aware 3D IC Partitioning and Placement by Optimizing the Critical Path
By Donggyu Kim †, Minjae Kim ‡, Junseok Hur †, Jakang Lee †, Jinoh Cho † and Seokhyeong Kang †
† Department of Electrical Engineering, Pohang University of Science and Technology, Pohang, Republic of Korea
‡ Baum Design Systems Co., Seoul, Republic of Korea
In the face of challenges posed by semiconductor scaling, 3D integration technology has emerged as a crucial solution to overcome the constraints of traditional 2D Integrated Circuits (ICs). Recent advancements in 3D vertical interconnection technology have enabled 3D interconnections with reduced area overhead, potentially enhancing 3D IC performance in terms of timing, power, yield, and cost. However, despite the increased inter-die connection capacity enabled by fine-pitch 3D vias, research on 3D IC partitioning methods for timing improvement remains insufficient. This paper proposes a partitioning and placement method that optimizes the timing of 3D ICs by leveraging the increased inter-die connection capacity provided by fine pitch 3D vias. By using the Leiden algorithm and unsupervised GNN, we achieve optimal partitioning without relying on the results of 2D placement or additional training data. Our method employs balanced COP-KMeans to incorporate critical path optimization into partitioning, while ensuring balanced cell allocation across dies, thereby maximizing the area benefits of 3D ICs. Additionally, we optimize the timing of 3D ICs through 3D cell placement with critical net weight adjustments and a novel 3D via placement approach that differs from traditional 3D Half-Perimeter Wire Length (HPWL) optimization perspectives.
To read the full article, click here
Related Chiplet
- High Performance Droplet
- Interconnect Chiplet
- 12nm EURYTION RFK1 - UCIe SP based Ka-Ku Band Chiplet Transceiver
- Bridglets
- Automotive AI Accelerator
Related Technical Papers
- 3D Stacked HBM and Compute Accelerators for LLM: Optimizing Thermal Management and Power Delivery Efficiency
- Energy-/Carbon-Aware Evaluation and Optimization of 3-D IC Architecture With Digital Compute-in-Memory Designs
- Optimizing Inter-chip Coupler Link Placement for Modular and Chiplet Quantum Systems
- MFIT : Multi-FIdelity Thermal Modeling for 2.5D and 3D Multi-Chiplet Architectures
Latest Technical Papers
- The Road to 64G UCIe IP: What Designers Need to Know
- Development and Optimization of Fine-Pitch RDL for RDL Interposer, and Embedded Bridge Die Interposer Fabrication Using Fan-Out Wafer-Level Packaging Technology
- Thermo-mechanical co-design of 2.5D flip-chip packages with silicon and glass interposers via finite element analysis and machine learning
- High-Efficient and Fast-Response Thermal Management by Heterogeneous Integration of Diamond on Interposer-Based 2.5D Chiplets
- HexaMesh: Scaling to Hundreds of Chiplets with an Optimized Chiplet Arrangement